DEPENDABLE RENEWABLE ELECTRICITY

Your next stage of growth.Its energy pathway starts here.

Australia’s renewable resources create an opportunity to plan new energy supply alongside new demand. Sunshine works with customers to develop that pathway.

Bring us your demand.
Let’s design around it.

For a data centre or industrial facility, energy is part of the growth plan. Location, connection, timing, cost and reliability all need to work together.

We assess combinations of renewable generation, batteries, flow batteries and pumped hydro against those requirements. Long duration energy storage helps move renewable electricity from the hours it is available to the hours it is needed.

Customer commitments can help support investment in new infrastructure. Our role is to bring the engineering, optimisation and commercial structure together.

Design more clean electricity for your growth.

A project designed to trade electricity may need a different configuration to supply your demand hour by hour. Sunshine brings engineering and AESOP optimisation together to maximise the volume of hourly matched carbon free electricity (CFE) available for long term contract, within agreed cost and reliability requirements.

We assess generation, storage duration and operating choices together, then compare the proposed design with a credible baseline. Detailed financial modelling tests whether the additional contracted supply can strengthen project bankability.

Our own developments and participating third party projects can contribute. The sequence follows your demand, project readiness, location and delivered cost. First supply need not wait for Djandori or Dumaresq.

A staged route
to new supply.

Timing and matching standards need to be explicit at each stage. The sequence below describes the approach, rather than a committed commissioning schedule.

Define demand

Location, growth and hourly profile

Agree interim supply

Available supply and disclosed firming

Develop new assets

Generation and storage linked to customer commitments

Measure delivery

Report certified hourly matching

A MEASURABLE COMMITMENT

Track clean energy
hour by hour.

Our proposed mature supply design targets certified, hourly matched carbon free electricity covering agreed demand in at least 98% of hours, subject to validation and agreement.

Electricity continues to be supplied in the remaining hours. Supply without a complete certified match is measured and reported separately.

A transition that follows your timetable.

Start with the supply available when you need it. Renewable generation, batteries and flow batteries can support earlier stages while larger storage projects progress. Suitable third party developments may qualify ahead of Sunshine’s own projects. Each stage needs its own delivery and hourly matching commitment.

Interim firming may include grid electricity or gas. It would be disclosed separately from certified renewable supply. The matching commitment for each stage must be agreed explicitly.

Project commissioning and supply dates depend on approvals, connections, financing, procurement and construction. A tailored assessment establishes the basis for a specific offer.

What does 98% mean?

It is a proposed hourly matching target: agreed electricity demand is fully covered by certified renewable CFE in at least 98% of hours in the modelled adverse year, subject to validation. It is not an electricity uptime measure or an annual renewable energy percentage. Management expects around 99.5% in more typical modelled conditions; that expectation requires project specific validation.

What happens during the remaining hours?

Electricity is still supplied. Some or all may lack a certified renewable match, depending on the supply available. Every MWh counted as certified renewable CFE is 100% renewable; any unmatched supply is reported separately.

Does pumped hydro generate new renewable energy?

It stores energy. Water is pumped uphill when electricity is available and released through turbines later. The complete system must account for charging electricity, storage losses and renewable certification.

What would we explore first?

Your location, demand profile, expansion schedule and clean energy objectives. That gives us a basis to propose a scoped assessment and a staged delivery pathway.

EXPLORE THE THINKING

Experience worth sharing.

Read What A Renewable Drought Really Tests
RENEWABLE ELECTRICITY · 24 Oct 2026

What A Renewable Drought Really Tests

What Sunshine’s Djandori modelling shows when wind and solar stay low On 18 May, the National Electricity Market gave us a useful stress test. Wind and solar output were unusually low. The previous day…

Renewable Electricity
Read Data Centres Do Not Run On Averages
RENEWABLE ELECTRICITY · 24 Oct 2026

Data Centres Do Not Run On Averages

Digital infrastructure needs real-time reliability Data centres are changing the electricity conversation. They are large, energy-intensive, and increasingly important to the economy. Cloud computing, artificial intelligence, financial systems, communications, health data, logistics, and everyday…

Renewable Electricity
Read Beyond Biomass
BIOMETHANOL & FEEDSTOCK · 25 Oct 2026

Beyond Biomass

How Green Hydrogen Helps Biomass Go Further Starting with biomethanol creates a disciplined staged investment pathway. Biomethanol is a practical starting point for producing cleaner fuel, targeting the lowest possible cost of production. It…

Biomethanol & Feedstock

Let’s discuss your Australian energy pathway

Discuss Electricity Supply